Featured Project · Case Study
FIELD LOG · LONE STAR LOGISTICS PARK
29.66°N · 95.47°W · OPERATING −10°F → 0°F
We Store Frozen · Houston, TX

100,000 SF Frozen
Storage Buildout

Cold storage buildout inside a 180,000 SF Class A shell. Five independent sub-zero rooms. Engineered precision. Delivered in 5 months.

Timeline
5 Months
Buildout
100,000 SF
Zones
5 Independent
Operating
−10°F → 0°F
Now ServingCostcoWalmartCVSHEB7 Fortune 50065 CustomersPre-Sold 70%Featured · Food DiveNow ServingCostcoWalmartCVSHEB7 Fortune 50065 CustomersPre-Sold 70%Featured · Food Dive
±2°F
Zone Uniformity
72 hr
Pulldown to Spec
41
Dock Doors
0
Thermal Failures

A 5-month deadline. 70% pre-sold capacity. No room for error.

We Store Frozen secured a 180,000 SF Class A distribution shell at 2304 Reed Road in Houston’s Lone Star Logistics Park, then needed 100,000 SF of it converted into five independent sub-zero rooms — operational in 5 months.

The pressure was real. The company was already 70% pre-sold before opening, with national tenants on the line and revenue tied to commissioning dates. Any miss on schedule, panel performance, or refrigeration spec would cascade across dozens of contracts.

The shell was new, but cold storage buildouts are unforgiving — vapor barrier integrity, panel joint detailing, and slab heat protection all have to be perfect the first time. Houston’s humidity and Gulf Coast climate raise the dew point stakes further.

Lone Star Logistics Park
2304 Reed Road · Houston, TX
Site
Shell
180,000 SF · Class A by Hines
Buildout
100,000 SF · 5 × 20,000 SF
Clear Height
32 ft
Dock Doors
41 dock + 2 drive-in
Refrigeration
NH₃ ammonia + glycol

Complete cold buildout. Engineered, executed, commissioned.

  • 01

    Thermal Envelope Engineering

    5-inch insulated metal panel installation across all five rooms. Continuous vapor barrier system engineered for sub-zero conditions. Thermal break protection at every panel joint, penetration, and structural connection. Heated underslab glycol loop with sub-slab insulation to prevent frost heave.

  • 02

    Refrigeration-Ready Infrastructure

    Mechanical room and piping infrastructure built for industrial ammonia refrigeration with glycol secondary loop. Independent climate control architecture for each 20,000 SF room. Final refrigeration equipment installed by owner’s refrigeration contractor.

  • 03

    Structural Integration

    Panel-to-structure integration with existing Hines steel framing. Dock door sealing systems for cold chain continuity. High-speed roll-up doors at each room entry to minimize thermal loss during forklift traffic. MEP coordination with existing building systems.

  • 04

    Commissioning & Verification

    Post-installation temperature mapping across all five rooms. Pulldown verification: all rooms reached target temperature within 72 hours. Recovery testing: less than 3°F variance after sustained door cycle simulations. Full commissioning documentation delivered for regulatory and customer onboarding.

Operational on time. 65 customers onboarded. A second facility followed.

Operational Facility · Q2 2024
Distributing within two weeks of commissioning
Live

All five rooms hit target temperature within 72 hours of commissioning, with zone uniformity within ±2°F and zero thermal failures since opening. The facility was distributing within two weeks of go-live.

65
customers onboarded — including 7 Fortune 500 companies — before the facility was fully online.
17%
operational cost reduction via the Zimark AI partnership, enabled by the efficient thermal envelope.
2nd
180,000 SF Houston facility opened March 2025 on the strength of the first.

Since opening, We Store Frozen has grown into one of Texas’s leading cold storage and logistics providers. The company now counts Costco, Walmart, CVS, and HEB among its customers, has been featured in Food Dive, and partnered with Zimark (a ZIM Integrated Shipping Services subsidiary) on AI-powered warehouse automation — reducing operational costs by 17% on the efficient thermal envelope we engineered.

The success of the first facility enabled We Store Frozen to expand to a second 180,000 SF Houston location in March 2025.

Build Your Cold Storage

Have a project like this?
Let’s build it.

From port-adjacent import facilities to multi-zone frozen distribution — we engineer cold storage from concept through commissioning. Houston-headquartered. Building nationwide.

Featured in Food Dive · Partnered with Zimark (a ZIM Integrated Shipping Services subsidiary) on AI-powered warehouse automation.